State-Wise Solar Subsidy in India 2026: Every State Compared
The Short Answer
Every Indian state receives the central PM Surya Ghar subsidy of up to ₹78,000. A few states — notably Gujarat, Rajasthan, and Uttarakhand — offer additional state-level top-ups of ₹5,000–₹15,000 per kW. Most other states provide only the central subsidy. The real differentiator across states is DISCOM processing speed and net metering policy, not the subsidy amount itself.
How State Subsidies Work Alongside Central Subsidy
India's solar subsidy structure has two independent layers:
- Central subsidy (PM Surya Ghar): Uniform across all states. ₹30,000/kW up to 2 kW + ₹18,000/kW for 3rd kW. Maximum ₹78,000. Funded by MNRE
- State subsidy: Additional incentive from the state government or DISCOM. Available in select states only. Funded by state budget. Amount and eligibility vary by state and financial year
Both subsidies are credited independently — central via DBT from MNRE, state via the state/DISCOM mechanism. You apply for central subsidy on the PM Surya Ghar portal and for state subsidy on the respective state portal (where applicable).
State-Wise Subsidy Comparison Table
States with Best Solar Subsidy Benefits
Factoring in central subsidy, state top-ups, net metering generosity, and DISCOM efficiency, these states offer the best overall package:
- Gujarat — Highest combined subsidy (₹1,08,000 for 3 kW). Surya Gujarat portal streamlines the state top-up. All four DISCOMs process efficiently. India's solar leader in rooftop adoption
- Delhi — Central subsidy plus unique generation-based incentive of ₹2/unit exported for 5 years. With high electricity tariffs (₹8–₹12/unit), Delhi homeowners see the fastest payback in India
- Rajasthan — Additional state top-up for select categories. Excellent solar irradiance (5.5–6.0 peak sun hours) means higher generation per kW
- Karnataka (BESCOM) — No state top-up, but BESCOM has one of the fastest net metering approval processes in India. Fully online application
Net Metering Policies by State
DISCOM Processing Speed: What to Expect
Your DISCOM's efficiency determines how long the overall process takes. Based on installer experience across our network:
- Fast (30–60 days total): BESCOM (Karnataka), UGVCL (Gujarat), BSES/TPDDL (Delhi)
- Moderate (60–90 days): MSEDCL (Maharashtra), TANGEDCO (Tamil Nadu), PSPCL (Punjab)
- Slow (90–120+ days): Some UP DISCOMs, certain rural DISCOMs with heavy backlog
These timelines cover feasibility approval through commissioning and subsidy credit. Your installer's experience with the specific DISCOM matters — an empanelled installer with strong DISCOM relationships can cut weeks off the process.
How to Find Your State's Current Subsidy
State subsidy policies change with annual budgets. To get the latest information:
- PM Surya Ghar portal — Shows central subsidy (always current) and may list active state schemes
- Your DISCOM's website — Most DISCOMs have a dedicated 'Rooftop Solar' or 'Net Metering' section
- State renewable energy development agency — GEDA (Gujarat), HAREDA (Haryana), RRECL (Rajasthan), etc.
- Ask your installer — Experienced local installers know the latest state policies and can guide you
Use our Subsidy Checker to see the combined central + state subsidy for your specific location and system size.
Get State-Specific Quotes
Solar Vipani connects you with local, MNRE-empanelled installers who know your state's subsidy landscape inside out. Your quote includes both central and state subsidies applicable to your location.
Common questions
Which Indian state gives the highest solar subsidy?
Is the solar subsidy same in all states?
How do I know if my state has an additional solar subsidy?
Does the subsidy amount change every year?
Can I apply for subsidy if my state does not have a top-up?
Ready to go solar? Find verified solar installers across India